
all the best, gutting, and un-gutting is as dire as it sounds.
i'm chipping away at my kitchen wall next few days, i fucked up good-style

and didn't use enough damp proof course injection material for the outer masonry, and damp has permeated into the plaster, the inside.
mould hasn't cropped up yet, but it won't when i'm through. (knock all plaster off and redo after damp proofing is done and set.)
it'll be at least a week before the drum arrives and the injection gear.
this sucks...

at least it'll be over soon.

[edit]
typo.